NERC Grants 3 Captive Power Permits For 14.12MW, BUA Cement Gets 12MW

The Nigerian Electricity Regulatory Commission (NERC) approved three captive power generation permits with a combined capacity of 14.12MW in the second...

Read full coverage on TraceNews